Customization: | Available |
---|---|
Type: | Semi Trailer |
Load Capacity: | 58.5cbm |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dimension | |
Tare Weight | 15000 KG |
Pay Load | 25000 KG |
Overall Length | 13000 mm |
Overall Width | 2500 mm |
Photo for reference, finial product can be made according to exact requirements | |
Tank | |
Transporting Media | Dimethylmethane, Liquid Ammonia, Liquid SO2, LPG,Butane |
Shape | Round Shape |
Total Volume ( m3 ) | 58.5 CBM |
Tanker Body Steel Sheet | Q235A/14mm |
End plate | Q235A14mm, by punching |
Parts for Tank | |
Manhole cover | 3 sets of 500mm/Q235 manhole fixed on top of Tank, with breather valve |
Unloading valve | 2-3 sets of DN80 fixed at button of Tank |
Pipeline at button of tank | 4"seamless steel tube/Q235 |
Labeling system | Oil Type Indication |
Anti-static electricity system | pulling, wire carrier, sheet copper (6 sheet-standard layout) |
Other Parts | |
Ladder | 1 unit at front of Tank |
Guard on top of Tank | Zinc galvanized -guard-net |
Oil hose box | Circular single hole tube, 1 unit on each side |
Oil hose | 2 unit, 3" x 6m size in black rubber |
Side guard | cross bar-structure |
Rear button guard | Fixed type |
Work tank deck | Box type |
Fire extinguisher box | 2 unit at the back of each side |
Mud guard | Steel structure in trapezoid form |
Lights and wire | 24V, 7 coils with lights for parking, reverse, instruction, head lamp and end lamp |
Chassis | |
Main Beams | Heavy duty and extra durability designed; Opting for high tensile steel Q345B,welded by automatic Submerged-Arc processes |
Axle | 3 axle |
BPW brand FUWA brand | |
Landing Gear | JOST Two-speed, manual operating, heavy duty landing gear |
King Pin | JOST 2"standard bolt-in king pin |
Suspension | German design mechanical suspension |
Pneumatic Braking System | WABCO RE 6 relay valve; T30/30+T30 Spring brake chamber; 45L air tanks. |
Wheel rim | 8.25R22.5 wheel rim |
Tire | 11R22.5 tubeless tire with one spare tire |
Painting | Complete Chassis sand blasting to clean rust, 1 coat of anticorrosive prime, 2 coats of final paint |