Customization: | Available |
---|---|
After-sales Service: | 24 hours after sale service |
Warranty: | 6 Months or 50000kms |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tank | |
Transporting Media | Dimethylmethane, Liquid Ammonia, Liquid SO2, LPG, Butane |
Shape | Round Shape |
Total Volume(m3) | 55CBM |
Tanker Body Steel Sheet | Q235A/14mm |
End plate | Q235A/14mm, by punching |
Parts for Tank | |
Manhole cover | 3 sets of 500mm/Q235 manhole fixed on top of Tank, with breather valve |
Unloading valve | 2-3 sets of DN80 fixed at button of Tank |
Pipeline at button of tank | 4"seamless steel tube/Q235 |
Labeling system | Oil Type Indication |
Anti-static electricity system | pulling, wire carrier, sheet copper (6 sheet-standard layout) |
Other Parts | |
Ladder | 1 unit at front of Tank |
Guard on top of Tank | Zinc galvanized -guard-net |
Oil hose box | Circular single hole tube, 1 unit on each side |
Oil hose | 2 unit, 3" x 6m size in black rubber |
Side guard | cross bar-structure |
Rear button guard | Fixed type |
Work tank deck | Box type |
Fire extinguisher box | 2 unit at the back of each side |
Mud guard | Steel structure in trapezoid form |
Lights and wire | 24V, 7 coils with lights for parking, reverse, instruction, head lamp and end lamp |
Chassis | |
Main Beams | Heavy duty and extra durability designed; Opting for high tensile steel Q345B,welded by automatic Submerged-Arc processes |
Axle | 3 axle |
BPW/ FUWA/HJ/L1 Brand 12 ton | |
Landing Gear | JOST Two-speed, manual operating, heavy duty landing gear |
King Pin | JOST 2"standard bolt-in king pin |
Suspension | German design mechanical suspension |
Leaf Spring | 13-pcs |
Wheel rim | 8.25R22.5 wheel rim |
Tire | 11R22.5 tubeless tire with one spare tire |
Pneumatic Braking System | WABCO RE 6 relay valve; T30/30+T30 Spring brake chamber; 45L air tanks. |
Painting | Complete Chassis sand blasting to clean rust, 1 coat of anticorrosive prime, 2 coats of final paint |
Q1.Are you manufacture or trade company? How to buy from you?
A: We are SINOTRUK branch factory, professional in special vehicles please call me
Q2. What are your terms of payment?
A: 30% as deposit, and 70% before shipment, all by T/T.
B: 30% as deposit, and 70% against B/L copy, all by T/T
C: 30% as deposit by T/T, 70% by L/C before shipment.
D: 100% L/C before production.
Q3. What trade terms do you have?
A: FOB, CFR, CIF, DAF
Q4. What's the delivery time?
A: Generally, it will take 35-45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.